The world of prefab and modular homes.
 Entries tagged as 'EcoSteel'

Two EcoSteel projects moving along

Link to Two EcoSteel projects moving along
© Steve Cullen - from http://picasaweb.google.com/CullenRanch/CROAndMilkyWay

I've received an update on a few info_smallEcoSteel projects. There's been significant progress with the house and observatory (pictured above), designed by info_smallGregory La Vardera, that we first covered them about a year ago.

The large project consists of a 7,000+ sf custom home, a "toy garage" and a private observatory. Definitely not your average home! Because of the project's remote location in Rodeo, New Mexico, not many contractors were available. So, homeowner Steve Cullen chose prefab. Some of the advantages:

  • faster build
  • ease of delivery and installation
  • design flexibility
  • strength and quality control
  • eco-efficiency

A number of images of the home's progress, as well as some cool night shots of the observatory are available on Picasa.

Another project, Goshawk Ranch, has its own blog. Under construction since September, the home looks to be moving along. The blog's most recent post shows the newly installed wall panels and front door.

EcoSteel's prefab system consists of a home's steel frame, both interior and exterior, along with exterior wall and roof panels. The remainder of the design and materials are left to the homeowner and local contractors. We discussed the system in detail last year.

This skeleton-and-skin sort of offering is not uncommon. A number of other prefab companies sell similar systems, with a range of additional design help. info_smallRocio Romero's info_smallLV Series homes come without finishes, but with a list of recommendations on finishes and vendors. And info_smallSander Architects design the entire home, but only prefabricate the steel framing.

Related Posts:
   1. Emphasizing quality not price (Apr 10, 2007)
0 comments, 0 trackbacks (URL) , Tags: process EcoSteel website steel

Kiplinger's on prefab

Link to Kiplinger's on prefab

One year ago, Kiplinger's Personal Finance featured an article on Fabulous Prefabs.

The article details homeowners Scott and Lisa McGlasson's decision to purchase an info_smallAlchemy Architects' info_smallweeHouse as a summer home for a lot they own in Minnesota:

"The couple wanted to keep a lid on building costs, but they did not want to sacrifice great design and solid construction. They met both goals with a two-story modern built by Alchemy Architects, in St. Paul. 'During the day we have a lake view from 8-foot windows,' says Scott. 'But when we close the curtains at night, the living room is chic enough to feel like a New York City apartment.'

The McGlassons' hideaway -- with two bedrooms, one bathroom and tons of personality -- is a prefabricated home. The components were assembled in a factory, trucked to their lot and put together....

Scott and Lisa paid $95,000 for their second home. They chose the layout of the first story from a half-dozen of Alchemy Architects' plans and added a second story to the blueprints, expanding the size to 780 square feet. The firm hired a Wisconsin factory to manufacture the house's components, a process that took about six weeks. The components were trucked from the factory on a flatbed, and a crane helped assemble them (delivery and crane costs ran $6,000). The McGlassons hired contractors to connect the house's wiring to the electrical grid, dig a well and do other finishing work. The final tally was about $160,000, including fixtures and appliances."

The article also outlines some key differences between panelized and modular construction:
"Panelized houses are made of sections stuffed with wiring and insulation. The panels are trucked to your lot, where contractors hired by you (or less commonly, by the prefab firm) join them together. Panelized houses tend to cost more than modular ones. But because the panels can be arranged in different ways, panelized houses can have custom options....

The flexibility of a panelized house makes it superior for building on mountain, beach and lakefront locations, which tend to have more quirks than the typical suburban lot....

The major limitation of modular houses is size: Modular units must be able to travel down highways. 'We have to do a lot of thinking within the box,' jokes Joseph Tanney, a partner at Resolution: 4 Architecture, a New York firm that builds prefab homes using modular and other methods. What's more, modular houses often need thicker-than-usual interior walls to ensure that they will withstand the stress of being lifted onto your lot by a crane. (Panelized homes don't face this problem.) These thicker walls reduce the number of floor plans because there are only so many ways the fatter walls can be disguised."

Kiplinger's included a slideshow that covers several companies we've covered here:
info_smallEmpyrean
info_smallAlchemy Architects
info_smallOMD
info_smallCleverHomes
info_smallLazor Office
info_smallEcoSteel (aka EcoContempo)
info_smallTaalman Koch
info_smallResolution: 4 Architecture
info_smallMKD
info_smallRocio Romero.

Title: Fabulous Prefabs
Author: Sean O-Neill
Publication: Kiplinger's Personal Finance
Length: 1,500 words
Date: July, 2006

0 comments, 0 trackbacks (URL) , Tags: weeHouse model CleverHomes OMD MKD article Alchemy Architects EcoSteel Flatpak House iT house Lazor Office LV Series Rocio Romero Taalman Koch

Emphasizing quality not price

Link to Emphasizing quality not price
www.ecocontempo.com

EcoContempo (a division of Northern Steel International) showed its steel-framed homes at CA Boom 3. I spoke with Chris Graham yesterday to find out why they didn't return.

Did you have a good response from CA Boom last year?

"We ended up with two clients from the show."

So, why didn't you return this year?

"We wanted to get to more specific markets to target architects and contractors. We put a lot of money and time into our website, that we've just launched. And we want to gear our marketing message to specific entities. More people are understanding the process, and we will probably be at CA Boom next year. We just have a limited budget at this point and we decided it was better not to attend this year."

What sort of marketing are you doing to architects and developers?

"We have a partner architect program; they are generally more interested in learning about the product. When [homeowners] come to us with a custom design, a lot of times, they are just pretty pictures and it doesn't take advantage of the efficiencies of our system. If we can get to the architect from the beginning, with our design, they can save on the design and build from the beginning. It's much more efficient."

Do you have many built homes or homes under construction?

"We have five homes completed to date, all around the country. And there are four homes under construction right now. Or rather, four in process: one is under construction, 2 are in engineering, and we have another one for which we are ordering materials; it will be under construction in six weeks."

You offer general models on your website, but it sounds like you offer custom models also?

"We lean more toward custom than standard models. We only have those designs because of Greg La Vardera, one of our partner architects. He understands our systems and can design fairly quickly for it. We aren't a design firm. If you came to me and said 'I want to do a 4,000 sf home,' I would direct you to an architect, like Greg. Currently we are building one modified standard model, completely converted and expanded. The other three projects are all custom."

What are some of the advantages of your prefab system?

"For people that are green conscious, we use about 70% recycled steel in our buildings. And it's a quicker build. We'll probably be able to finish a project in 9 months total, compared to 18 months for many site-built projects. And durability — it's steel. We have steel I-beams and steel insulated panels. And energy efficiency is number one. The original technology has been used for commercial refrigeration products for years, so you're not going to lose energy there. It is more energy efficient than a SIP product, and more structurally sound."

Are there any common misconceptions about prefab that you'd like to comment on?

"'Many people ask 'Is this cheaper than wood build?' We are trying to sell the quality and durability of our product. We aren't necessarily going to be cheaper and we generally don't come in under $200 or $250/sf, but we can."

You say you can — what do you mean? What comes in an EcoContempo package and how is there flexibility?

"The flexibility with our system is that the end user can decide exactly what interior finishes they want. They can take it as far as placing sheet rock on every wall and ceiling or choose minimalist features and keep a lot of the steel exposed. Your insulation value is secure once the panels are in place which allows, among other things, the option of painting the steel and using it as shelves. Our steel system includes your primary and secondary steel frame system, insulated wall and roof panels, windows, doors as well as sub-framing on the interior (i.e. metal studs with pre-punched electrical holes on each stud for ease of wiring, ready for drywall screws). Additionally, we provide all the structural engineering which includes stamped sets of drawings required to submit for necessary building permits."

(This interview has been edited for space and clarity; it's not an exact transcript.)

Related Posts:
   1. Two EcoSteel projects moving along (Jun 23, 2008)
0 comments, 0 trackbacks (URL) , Tags: model CA Boom EcoSteel
Our aim is to create the web's #1 resource for prefab and modular homes. Read our blog for daily news, and browse around to learn more about the emerging world of prefab.