|
||
Entries
tagged as 'Simplex'
The February 2009 issue of Dwell Magazine featured a modular home in Lost River, Virginia. model: Lost River Modern
designer: Resolution 4 Architecture
manufacturer: Simplex Homes
size: 1,900 sf
br: 3
bath: 2
Worth a look: slideshow of 7 pictures. Note: The house was built in 2007 - 2008. The owners tracked the entire process via their blog: A PreFab Project. Check out our related posts for more information. Title: Take Me Home
Subtitle: A “tree house” of clean lines, ample glass, and thoughtful ingenuity lets a Washington, DC–area family and a stream of weekend guests enjoy prefab living in an unlikely locale: just outside Lost River, West Virginia.
Author: Jeremy Berlin
Publication: Dwell Magazine
Section: My House
Length: 816 words
Date: February 2009
Hat tip: Apartment Therapy on August 7, 2009. TV meets the Web. Bob Vila's website includes a library of short video clips from the show's Modern Modular series. Show: Home Again: Modern Modular (at BobVila.com)
Network: DIY Network
Length: 58 clips (from 13 episodes)
Also worth a mention: Bob Vila has his own blog, On The Level. Check it out! Bob Vila's Home Again on the DIY Network just finished a run of shows about a modular home under construction. I haven't seen the show, but it sounds like there were some good views into the factory and site process. From the episode descriptions: Modern Modular: "Bob Vila travels to western Massachusetts for a brand new project; the construction of a modular home in the Berkshire Hills. He goes to the Simplex Industries factory in Scranton, Pa., to see how the process starts. We talk with owner Pat Fricchione, Jr. about the history of the company, and how the image of modular construction has changed over the years."Wall Panels: "Today, we learn about the manufacturing process for the precast panels for the walls. Next, we travel back to the Simplex plant in Scranton Pa., where Bob Vila explains how each module is framed. Back in the Berkshires, the assembly process is explained once the panels have been lowered into place by crane."Assembly: "At the Simplex plant, several crews work as if on an assembly line to make fast work of each module. There's a lot happening, from spackle and sand, to insulation, wall and roof sheathing, house wrap, and interior trim. Bob Vila learns about the state-of-the-art wire boxes that are being installed, and we'll look at the staircase that's being built for the front hall from the stair shop." Simplex is also the manufacturer of the Resolution: 4 Architecture models, like the home featured on the A Prefab Project blog. A small picture of the home coming together can be seen on the Bob Vila web site. Show: Home Again: Modern Modular
Network: DIY Network
Length: 13 episodes
The folks over at A Prefab Project are having an exciting time, with the delivery and set of their prefab home. A post on Friday announced the successful arrival of the module on site: "After many hours on the road and seven flat tires, our house arrived at the site in WV a little after 6:30 Wednesday evening." Luckily the module arrived in good condition with little damage: "Well, good news is the house made it fine. No real issues - some minor drywall cracking, a couple of window locks popped during travel that will need to be replaced (not sure exactly what will need to be replaced - Simplex will let me know). Structurally, the house came through great. Window panes are all intact, the loose materials that shipped inside the box didn't do any damage, and no water got in." On Monday, the house was finally set: "No attempt at a witty title - I'm too tired. But everything went great. The set was a breeze. Only really took about fifteen minutes to actually lift, move and set the box (and about six hours to set up and break down the crane)." Homeowner Chris also gave a detailed and useful look at the foundation work that occurred prior to the module's arrival. |