The world of prefab and modular homes.

CA Boom V recap

Link to CA Boom V recap
http://la.curbed.com/archives/2008/03/ca_boom_the_pre.php

We couldn't attend this year's CA Boom show in Los Angeles, so here are a few recaps from others:

Curbed LA took a look at the Modern-Shed booth:

One interesting new [entrant] was ... the itty-bitty Modern Shed and its quaint homemade sale sign in the window: "$15,000 with deck. Free Local Delivery."
They also went on a tour of the Red Barn Prefab that we covered previously:
The designer of the home was on site, and gave a brief introductory speech before we started exploring and snapping pictures. The home was built using re-engineered steel, concrete floors (natch) and eco-timber flooring.... The home took nine months to build and actually has a twin next door...

The LA Times slideshow included a tour of an info_smallOMD home.

We previously covered Allison Arieff's related interview; here's the accompanying slideshow.

Related Posts:
   1. Allison Arieff in LA Times (Mar 18, 2008)
   2. CA Boom V coming soon: March 14-16 (Mar 05, 2008)
0 comments, 0 trackbacks (URL) , 
Add Comment
Ignore this field:
 optional; will not be displayed
Don't put anything in this field:
 optional
Don't put anything here:
Leave this empty:
URLs auto-link and some tags are allowed: <a><b><i><p>.
Our aim is to create the web's #1 resource for prefab and modular homes. Read our blog for daily news, and browse around to learn more about the emerging world of prefab.